Serving all of Orange County, CaliforniaFree estimates  · (949) 275-8271
TYLER J CONSTRUCTIONGeneral Building Contractor
Accessibility Compliance

ADA & Title 24 compliance construction in Orange County.

We do the building side of accessibility: reading the report, pricing the corrections, pulling the permit, and getting the work signed off — on restrooms, ramps, path of travel, doors and parking.

[ Photo — accessible restroom or ramp ]
Why owners call

Three things usually start the clock.

  1. 01

    A CASp report landed

    An inspector documented the barriers. You need somebody to turn that list into a scope, a price, and finished work.

  2. 02

    A remodel triggered upgrades

    Plan check flagged path-of-travel work as a condition of your tenant improvement permit, and the budget just moved.

  3. 03

    A demand letter arrived

    You need the physical barriers corrected quickly and documented properly. Talk to your attorney; we will handle the construction.

Scope

What we correct.

Built to the current California Building Code, Chapter 11B, and inspected by the city or county having jurisdiction.

Process

From report to sign-off.

  1. Step one

    Walk & review

    We visit the property with your report or plans and verify every item in the field.

  2. Step two

    Line-item estimate

    Priced by barrier, so you can phase the work or prioritize what carries the most exposure.

  3. Step three

    Permit & build

    Drawings where required, permits pulled, and work staged around your tenants and hours.

  4. Step four

    Inspection & record

    Final sign-off, plus photos and closeout documents for your file.

Questions

Commonly asked.

What is the difference between the ADA and Title 24?

The ADA is federal civil rights law. Title 24 is the California Building Standards Code, and its accessibility requirements live in Chapter 11B. California enforces the stricter of the two, which in most cases means building to Chapter 11B.

Will my tenant improvement trigger accessibility upgrades?

Often, yes. Alterations to a primary function area generally require the path of travel serving it — entrance, route, restrooms, drinking fountains, telephones — to be brought up to current standards. California caps that added cost as a share of the alteration budget when it would be disproportionate. Your plan checker makes the final call, and we will price it either way before you commit.

Do I need a CASp inspection first?

Not to hire us. A CASp report makes the scope cleaner and carries legal benefits in California, so it is usually worth having — but if you already know what plan check or a demand letter flagged, we can start from that.

Can you work around an open business?

Yes. Most restroom and path-of-travel corrections can be staged nights, weekends, or one area at a time so the doors stay open. We will lay out the sequence with the estimate.

Send the report. Get a real number.

Attach your CASp report, plan-check correction list, or demand letter and we will come back with a line-item estimate.